The Current German EEG Without Perspective

Update (Novem­ber 2026): This arti­cle reflects the debate of Sep­tem­ber 2024. The options paper dis­cussed below has since been over­tak­en by the EEG 2027 reform. For the cur­rent state of the amend­ment and what it means for agri­v­oltaics and solar-plus-stor­age, read our lat­est analy­ses: Final EEG 2027 draft: what changes for agri­v­oltaics, Cab­i­net deci­sion on the EEG 2027 amend­ment and Is agri­v­oltaics still worth­while under the EEG 2027?

The ener­gy tran­si­tion in Ger­many has reached a crit­i­cal turn­ing point. With the revi­sion of the Renew­able Ener­gy Sources Act (EEG) due by 2026, sup­port for renew­able ener­gy is fac­ing a fun­da­men­tal redesign. In August, the Fed­er­al Min­istry for Eco­nom­ic Affairs and Cli­mate Action (BMWK) pub­lished a dis­cus­sion paper set­ting out sev­er­al options for the future mar­ket design, includ­ing for renew­ables. Mar­ket par­tic­i­pants were invit­ed to sub­mit their feed­back on these pro­pos­als by 6 Sep­tem­ber 2024.

EU require­ments for the future

The Euro­pean Union has set itself ambi­tious cli­mate tar­gets, aim­ing to become cli­mate-neu­tral by 2045. A key ele­ment of this strat­e­gy is the full inte­gra­tion of renew­able ener­gy into the ener­gy sys­tem. The EU is aim­ing for a flex­i­ble, mar­ket-based sys­tem that ensures both secu­ri­ty of sup­ply and cost effi­cien­cy. This calls for new approach­es to mar­ket design that take the dynam­ic nature of renew­able ener­gy into account.

The min­istry’s pro­pos­als for future renew­able ener­gy sup­port

The min­istry presents four pos­si­ble options for the invest­ment frame­work for renew­able ener­gy:

Option 1: Slid­ing mar­ket pre­mi­um with a refi­nanc­ing con­tri­bu­tion

This option is a two-sided con­tract for dif­fer­ence with a mar­ket val­ue cor­ri­dor. It is a pro­duc­tion-based mod­el that adapts the exist­ing mar­ket pre­mi­um scheme. A repay­ment mech­a­nism (“claw-back”) is includ­ed to ensure that pre­mi­ums are paid back when mar­ket rev­enues are par­tic­u­lar­ly high.

Option 2: Pro­duc­tion-based two-sided con­tract for dif­fer­ence with­out a mar­ket val­ue cor­ri­dor

This option links the vol­ume of elec­tric­i­ty pro­duced direct­ly to mar­ket prices, with­out the pro­tec­tion of a mar­ket val­ue cor­ri­dor. It offers stronger mar­ket align­ment but is also more exposed to price volatil­i­ty.

Option 3: Pro­duc­tion-inde­pen­dent two-sided con­tract for dif­fer­ence

Here, the con­tract is not tied to actu­al elec­tric­i­ty pro­duc­tion but to the poten­tial of the plant. This vari­ant aims to bet­ter cush­ion vol­ume risk and mar­ket fluc­tu­a­tions and cre­ates incen­tives for sys­tem-friend­ly plant design.

Option 4: Capac­i­ty pay­ments with a pro­duc­tion-inde­pen­dent refi­nanc­ing con­tri­bu­tion

This is the most com­pre­hen­sive mod­el. It pro­vides for (rather com­plex) capac­i­ty pay­ments that are made regard­less of actu­al elec­tric­i­ty pro­duc­tion. This option is intend­ed to improve mar­ket inte­gra­tion and min­imise the risk of neg­a­tive price sig­nals by decou­pling the sys­tem from pure pro­duc­tion depen­den­cy.

In its Growth Ini­tia­tive, the Ger­man gov­ern­ment decid­ed to back Option 4 (capac­i­ty pay­ments with a pro­duc­tion-inde­pen­dent refi­nanc­ing con­tri­bu­tion). The change is meant to ensure that price sig­nals can work with­out dis­tor­tion and is seen as a future-proof way to reach the expan­sion tar­gets for renew­able ener­gy.

Indus­try feed­back

Ger­man Renew­able Ener­gy Fed­er­a­tion (BEE): The BEE wel­comes the BMWK’s options paper as a basis for the long-over­due reform of the elec­tric­i­ty mar­ket design. The BEE favours Options 1 and 2, as they allow bet­ter mar­ket align­ment and min­imise risks for investors. Options 3 and 4 are viewed crit­i­cal­ly because they car­ry con­sid­er­able vol­ume and price risks that could increase financ­ing costs. The BEE pro­pos­es devel­op­ing Option 1 fur­ther into a mech­a­nism based on a real-rev­enue CfD that offers both flex­i­bil­i­ty and plan­ning cer­tain­ty. Flex­i­bil­i­ty is the guid­ing prin­ci­ple of the ener­gy tran­si­tion, and the BEE calls for it to be giv­en pri­or­i­ty in a ded­i­cat­ed flex­i­bil­i­ty agen­da.

Ger­man Asso­ci­a­tion of Ener­gy and Water Indus­tries (BDEW): The BDEW sup­ports a pro­duc­tion-inde­pen­dent sup­port mod­el such as Option 4 in the long term, pro­vid­ed the ref­er­ence plant method­ol­o­gy is sim­ple and low-risk. How­ev­er, the BDEW con­sid­ers the intro­duc­tion of such a mod­el by 2027 unre­al­is­tic and rec­om­mends ini­tial­ly pur­su­ing Options 1 and 2 in com­bi­na­tion with a mar­ket vol­ume mod­el. It is essen­tial that the ramp-up of renew­ables is not jeop­ar­dised, that flex­i­bil­i­ty incen­tives are not hin­dered and that con­fi­dence in Ger­many as an invest­ment loca­tion is main­tained.

The future: dis­patch­able hybrid renew­able solu­tions

As the BEE right­ly puts it, flex­i­bil­i­ty has become the guid­ing prin­ci­ple of this phase of the ener­gy tran­si­tion. Hybrid renew­able ener­gy solu­tions that diver­si­fy the port­fo­lio and make it more flex­i­ble are clear­ly the future. Giv­en price volatil­i­ty and the need to respond flex­i­bly to mar­ket sig­nals, a diver­si­fied port­fo­lio of tech­nolo­gies and approach­es will gain enor­mous val­ue. Hybrid sys­tems that com­bine solar and wind pow­er with ener­gy stor­age, for exam­ple, can bal­ance fluc­tu­a­tions in ener­gy sup­ply and increase secu­ri­ty of sup­ply. This flex­i­bil­i­ty will be cru­cial for mas­ter­ing the chal­lenges of a volatile mar­ket and for dri­ving the ener­gy tran­si­tion for­ward suc­cess­ful­ly.

Redesign­ing the mar­ket frame­work for renew­able ener­gy is a com­plex process that has to take many inter­ests and chal­lenges into account and weigh them against each oth­er. The min­istry’s pro­pos­als pro­vide a good basis for a broad debate, which will be key to the suc­cess­ful imple­men­ta­tion of the ener­gy tran­si­tion. How­ev­er, the indus­try’s feed­back also shows that the option favoured by the BMWK does not enjoy broad sup­port. No easy task for the fed­er­al gov­ern­ment. The com­ing months will show in which direc­tion the frame­work devel­ops.