Combine harvester harvesting grain between the module rows of an agrivoltaic system

What we do

Project development, EPC and storage for agrivoltaics

In short

Ylek­tra devel­ops agri­v­olta­ic projects with bat­tery stor­age across Ger­many: from secur­ing land with farm­ers and munic­i­pal­i­ties through plan­ning, per­mit­ting and grid con­nec­tion to ready-to-build sta­tus. We then build the plants our­selves as EPC con­trac­tor.

As of Octo­ber 2026 · Edi­tor: Ylek­tra GmbH

  • > 850 MWagri­v­olta­ic and hybrid project pipeline
  • > 950 haagri­cul­tur­al land in the pipeline
  • 8–14 monthsto con­struc­tion start for priv­i­leged projects
  • 16–24 monthswith a devel­op­ment plan (not priv­i­leged)

01 · Devel­op

Five steps to a ready-to-build project

One point of con­tact from the first con­ver­sa­tion on the farm to the grid con­nec­tion.

  1. 1

    Site and land

    GIS analy­ses of irra­di­a­tion, grid prox­im­i­ty, region­al plan­ning and pro­tect­ed areas. The grid sit­u­a­tion is part of the site analy­sis from the start. We then secure the land togeth­er with own­ers and farm­ers.
  2. 2

    Planning and layout

    Row spac­ing, height and ori­en­ta­tion fol­low the work­ing width and crop rota­tion of the farm. In Armsheim, 13.5 m row spac­ing leaves a 12 m work­ing width for stan­dard farm machin­ery.
  3. 3

    Permitting

    Build­ing appli­ca­tion for priv­i­leged sys­tems (Sec­tion 35 of the Fed­er­al Build­ing Code) or a devel­op­ment plan with the munic­i­pal­i­ty, plus nature con­ser­va­tion report, species pro­tec­tion assess­ment and an agri­cul­tur­al use con­cept under DIN SPEC 91434.
  4. 4

    Grid connection

    Con­nec­tion request, coor­di­na­tion with the grid oper­a­tor and, where pos­si­ble, a shared con­nec­tion for solar and stor­age, which low­ers cost and wait­ing time.
  5. 5

    Financing and ready-to-build

    Rev­enue mod­el (EEG, PPA or direct mar­ket­ing), financ­ing and cer­ti­fi­ca­tion. Once the project is ready to build, our EPC team takes over.

02 · Build

Turnkey EPC and operation

EPC stands for engi­neer­ing, pro­cure­ment and con­struc­tion: plan­ning, pro­cure­ment and con­struc­tion from one source, to a fixed scope of work.

E

Engineering

Detailed design of track­er field, elec­tri­cal sys­tem and stor­age, struc­tur­al design for the wind and snow load zone, lay­out based on the work­ing width and crops of the farm.

P

Procurement

Mod­ules, track­ers, invert­ers and stor­age cer­ti­fied to applic­a­ble IEC/EN stan­dards, with qual­i­ty assur­ance so that equip­ment and design meet the project tar­gets.

C

Construction

Pile dri­ving, mount­ing and elec­tri­cal instal­la­tion with licensed con­struc­tion part­ners. Site man­age­ment, grid con­nec­tion, com­mis­sion­ing and accep­tance remain with Ylek­tra.

On request we also take over oper­a­tion and asset man­age­ment over the 30-year life: mon­i­tor­ing, main­te­nance, mar­ket­ing, the annu­al proof of agri­cul­tur­al use under DIN SPEC 91434 and decom­mis­sion­ing, secured by a decom­mis­sion­ing bond.

03 · Tech­nol­o­gy

Trackers, storage and energy management

Single-axis trackers

Mod­ule rows fol­low the sun from east to west and gen­er­ate more elec­tric­i­ty per hectare than fixed sys­tems. For field work they turn into a con­ve­nient posi­tion. Row spac­ing is usu­al­ly 14 m on arable land and from 7 m on grass­land; pile-dri­ven posts keep seal­ing below 1 %.

Battery storage at the same connection

The bat­tery absorbs solar pow­er when the grid is full or prices are neg­a­tive and releas­es it when it is need­ed. Two to four hours of stor­age, depend­ing on the project.

Energy management and revenue stacking

An ener­gy man­age­ment sys­tem decides when to feed in, store or trade: EEG or PPA, day-ahead and intra­day trad­ing, and grid ser­vices such as bal­anc­ing ener­gy.

Ref­er­ences

Projects in development and construction

Armsheim · Rhineland-Palati­nate

About 50 MW on about 70 ha

Sin­gle-axis track­ers, a large-scale bat­tery with two to four hours of stor­age, around 90 % of the land stays arable. Urban devel­op­ment con­tract approved on 10 June 2026.

Project report

Soest-Deir­ingsen · North Rhine-West­phalia

About 5.1 MWp, under construction

Devel­oped and built by Ylek­tra as EPC gen­er­al con­trac­tor. Track­ers in 2P con­fig­u­ra­tion, grid con­nec­tion shared with a wind farm, com­mis­sion­ing planned for mid-2027.

Project report

For investors & part­ners

Partner with Ylektra

Acquire ready-to-build projects, co-devel­op from an ear­ly stage or co-invest in stor­age. Landown­ers in Ger­many find our lease offer on the Ger­man site.

FAQ

Questions on development, EPC and technology

As of Octo­ber 2026

How long does it take to devel­op an agri­v­olta­ic project in Ger­many?

For priv­i­leged agri­v­olta­ic sys­tems under Sec­tion 35(1) no. 9 of the Fed­er­al Build­ing Code, Ylek­tra expects about 8 to 14 months from project design to con­struc­tion start. If the project needs a devel­op­ment plan, it takes about 16 to 24 months, because addi­tion­al envi­ron­men­tal and plan­ning pro­ce­dures are required.

What does EPC mean for an agri­v­olta­ic sys­tem?

EPC stands for engi­neer­ing, pro­cure­ment and con­struc­tion. The EPC gen­er­al con­trac­tor takes on plan­ning, pro­cure­ment and con­struc­tion of a plant from one source, up to turnkey com­mis­sion­ing. In its agri­v­olta­ic projects, Ylek­tra is project devel­op­er and EPC gen­er­al con­trac­tor at the same time.

What is an agri­v­olta­ic sys­tem with track­ers?

In an agri­v­olta­ic sys­tem with sin­gle-axis track­ers, the mod­ule rows turn with the sun over the course of the day. Arable farm­ing con­tin­ues between the rows, and the mod­ules can be moved into a con­ve­nient posi­tion for field work. Under DIN SPEC 91434, such sys­tems belong to cat­e­go­ry II.

What does rev­enue stack­ing mean?

Rev­enue stack­ing means that a plant uses sev­er­al rev­enue sources at the same time: sup­port under the EEG or a PPA, whole­sale trad­ing on the day-ahead and intra­day mar­kets, and grid ser­vices such as bal­anc­ing ener­gy or con­ges­tion man­age­ment. An ener­gy man­age­ment sys­tem decides which source is used when.

How much land is sealed by an agri­v­olta­ic sys­tem with track­ers?

Very lit­tle, because the track­ers stand on pile-dri­ven posts. In the Soest project, seal­ing is below 1 % of the area, and more than 90 % remains avail­able for farm­ing.