EEG 2025 Changes the Game: Is It Worth Investing in Larger Agri-PV Systems?

The new EEG 2025 reshapes the frame­work for agri­cul­tur­al pho­to­voltaics (Agri-PV). While farm-near Agri-PV sys­tems up to 1 MW remain priv­i­leged and ben­e­fit from a fixed tar­iff of 9.2 ct/kWh (for com­mis­sion­ing in 2026), larg­er projects must com­pete in pub­lic ten­ders. But is it eco­nom­i­cal­ly viable to scale up? Ylek­tra has ana­lyzed prof­itabil­i­ty and return for farm-based Agri-PV sys­tems – based on real­is­tic project para­me­ters and mar­ket data.

We are fre­quent­ly asked by farm­ers and investors whether a 1 MW farm-near plant is more prof­itable than a 2 MW ten­dered plant. To bring full trans­paren­cy to this recur­ring ques­tion, we’ve run the num­bers under con­sis­tent, real-world assump­tions.

💡 Profitability of Farm-Based Agri-PV Systems (Example: 2.5 ha)

The fol­low­ing fig­ures are indica­tive aver­ages reflect­ing typ­i­cal eco­nom­ic con­di­tions for such sys­tems.

Para­me­terApprox. Val­ue
Area2.5 ha farm-near (priv­i­leged, < 300 m from farm)
Tech­nol­o­gyYlek­tra sin­gle-axis track­ing sys­tem (sun-fol­low­ing)
Yield1,250 kWh/kWp per year (avg. 20 years, incl. 0.5% degra­da­tion)
Sys­tem den­si­ty1 MWp / 1.2 ha → 2.5 ha = 2.08 MWp
CAPEX (turnkey)1 MW: 800 €/kWp • 2 MW: 760 €/kWp (–5% scale effect)
Financ­ing10% equi­ty, 90% debt, 4.5% inter­est, 20-year term
Infla­tion (OPEX)+2% per year (main­te­nance, insur­ance, etc.)
Sub­sidy peri­od20 years (EEG 2025 – 1 MW: 9.2 ct/kWh fixed • 2 MW: ten­dered)
Self-con­sump­tion0%
Cal­cu­la­tion peri­od20 years

💰 Fixed Cost Structure: Stable Financing, Moderately Rising OPEX

Costs1 MW Priv­i­leged2 MW Ten­dered
CAPEX (turnkey)€800,000€1,520,000
Equi­ty (10%)€80,000€152,000
Annu­al loan repay­ment€51,350€97,570
Avg. OPEX / year€17,650€33,550
Total annu­al cost€69,000€131,120

⚡ Revenue & EEG 2025 Comparison

For priv­i­leged 1 MW sys­tems, the tar­iff of 9.2 ct/kWh (com­mis­sion­ing 2026) is guar­an­teed for 20 years. Ten­dered sys­tems, how­ev­er, face com­pet­i­tive bid­ding. Based on cur­rent trends, Ylek­tra expects ten­der results to fall below 7 ct/kWh, as many large-scale projects (>5 MW) – includ­ing those devel­oped by Ylek­tra – ben­e­fit from sig­nif­i­cant­ly low­er spe­cif­ic costs.

Rev­enue1 MW2 MW
Annu­al yield (kWh)1,203,0002,406,000
Tar­iff9.2 ct/kWh? (ten­der)
Annu­al rev­enue€110,676?

📊 Break-even & Return Analysis

  • Equal annu­al prof­it: A 2 MW sys­tem must achieve 7.18 ct/kWh to gen­er­ate the same annu­al prof­it (€41,676) as a 1 MW sys­tem.
  • Equal IRR: To match an 8.7% inter­nal rate of return like the 1 MW sys­tem, the 2 MW sys­tem requires 8.95 ct/kWh.
Sys­temInvest­mentAnnu­al Prof­itReturn (IRR)
1 MW priv­i­leged€800,000€41,6768.7%
2 MW @ 7.18 ct€1,520,000€41,6764.9%
2 MW @ 8.95 ct€1,520,000€84,3808.7%

✅ Decision Matrix: 1 MW vs. 2 MW Farm-Based Agri-PV

Ten­der ResultRec­om­men­da­tion
< 7.18 ct/kWhBuild 1 MW – high­er prof­it per invest­ed euro
7.18 – 8.94 ct/kWhBuild 1 MW – bet­ter IRR
≥ 8.95 ct/kWhBuild 2 MW – equal or high­er return

📈 Conclusion: Profitability of Farm-Based Agri-PV in 2025

  • 1 MW farm-based (priv­i­leged): 8.7% return at €800,000 invest­ment.
  • 2 MW ten­dered: requires at least 8.95 ct/kWh to reach the same IRR.
  • At 7.18 ct/kWh, prof­it remains €41,676 but IRR drops to 4.9% – mean­ing the 1 MW plant yields more per invest­ed euro.

As we expect ten­der prices to set­tle below 7 ct/kWh, 2 MW sys­tems cur­rent­ly offer low­er returns than priv­i­leged 1 MW farm-based projects.

🚀 Next Steps: Get Your Free Agri-PV Profitability Calculator

Cal­cu­late your indi­vid­ual ROI based on land size, loca­tion, and tech­nol­o­gy – includ­ing break-even and IRR sim­u­la­tion.

Con­tact us: info@ylektra.com or 📞 +49 2236 39 53 989


Disclaimer

All val­ues are indica­tive aver­ages based on typ­i­cal mar­ket para­me­ters. CAPEX, OPEX, yields, and financ­ing con­di­tions may vary depend­ing on site char­ac­ter­is­tics, sup­ply chain fac­tors, and tech­ni­cal con­fig­u­ra­tion. Every Agri-PV project requires indi­vid­ual eval­u­a­tion.